Land & Legal Compliance Checklist
Upload the four documents that establish a clean starting point. Each moves from received β verified or flagged as it's reviewed.
Jurisdiction Mapper
Tell us the locality (or drop in coordinates you already have) and we'll flag whether you're looking at BBMP, a BDA layout, or Gram Panchayat β and what that means.
Where's the site?
Approvals Guidance Engine
The step-by-step path from architect to Occupancy Certificate β sequenced for the jurisdiction you determined in the previous tab.
PMC Oversight Layer
Every player on the build, one shared timeline, a fixed visit cadence, and a hard payment gate β plus the honest list of where these projects usually go wrong, and how each one is handled here.
Review cadence
The fixed rhythm every project runs on β structured updates on a schedule, not only when something's gone wrong.
Every architect, contractor and sub-trade on this build β who they are, what they own, how often they're checked on, and whether that check is overdue.
Planned schedule for every milestone, in one view. A bar running past its planned end without being marked done shows up as a hazard-striped overrun β the slip is visible the moment it happens, not at handover.
Payment only releases once a milestone is marked done and signed off β that gate is the whole point.
Where these projects typically fall off
Change requests & issue log
Plan the house's utilities alongside the build, not after β including where it's worth going beyond the basic grid connection.
Site Log
Every site visit, meeting and certification in one searchable record β the single place the owner, architect, contractor and PMC all trust as what actually happened, and when.
Log a new entry
Every certificate, test report and compliance document the build has generated β at a glance, with expiry tracked automatically.
Every site photo, pulled from the log, newest first.